VERTICAL 3 LOOP SYSTEM
If land area is limited, vertical loops can be installed. Holes are drilled at a depth of 175ft., per ton of capacity. U-shaped loops of pipe are installed into the holes.
Why vertical directional drilling?
-
Limited loop field space
-
Better conductivity than slinky installation
-
Grouting ensures excellent loop conductivity
-
Environmentally safe
-
System can support additional HVAC needs
-
Rebates from utility companies
-
Sizing of new and retro-fit installations